Mill Creek / Opryland Equalization Facility - Phase II
Completed May 2015
This project increased the storage capacity of the existing equalization facility through the construction of a 19 million gallon pre-stressed concrete tank that was constructed adjacent to the existing 15 million gallon tank. The storage tanks are utilized when sewer flows exceed the capacity of the existing sewer system. The peak flows are stored until the flows in the system recede, and the stored volume can be conveyed through the system to treatment. Without the construction of this facility, flows in excess of the system capacity resulted in sanitary sewer overflows.
Project Details
Project Type: | Equalization Facility |
Project Area Map: | View map |
Metro Project #: | 11-SC-0102 |
Council District(s): | 19 |
Sewer basin: | Central |
Designer: | URS Corporation |
Contractor: | Cumberland Valley Constructors, Inc. |
Project Timeline
Phase | Start | Finish |
---|---|---|
Design | August 2012 | May 2013 |
Permitting/Bid/Award | May 2013 | January 2014 |
Construction | January 2014 | May 2015 |