Boscobel Sewer Separation
This project was developed to eliminate the Boscobel combined sewer overflow by providing separate pipe systems for sanitary sewer flows and stormwater flows, as opposed to the current combined system which conveys both in a single pipe network. Approximately 250 acres are targeted for sewer separation. Additional infrastructure improvements, such as water distribution improvements, may also be conducted as part of this work.
Project Details
Project Type: | Sewer Separation |
Project Area Map: | View map |
Metro Project #: | 11SC0123 |
Council District(s): | 6 |
Sewer basin: | Central |
Designer: | Hazen and Sawyer, P.C. |
Contractor: | TBD |
Project Timeline
Phase | Start | Finish |
---|---|---|
Design | November 2022 | December 2026 |
Permitting/Bid/Award | September 2027 | February 2028 |
Construction | March 2028 | May 2031 |
Project Photos
No photos available.